A clear path from part number to installed screen

Each stage of an LED display request should reduce uncertainty before components reach the site.

A clear path from part number to installed screen

The component journey

This workflow explains how we organize an inquiry. It is a practical sequence for selection and handoff, with checks that can be adapted to a new build or an existing display.

01

Record the existing setup

Capture module size and pitch, controller model, cabinet layout, voltage and service access.

Record the existing setup
02

Compare interfaces

Check receiver-card loading, HUB mapping, cable connectors and mechanical mounting.

Compare interfaces
03

Review the parts list

Confirm model options, quantities, spare units and any environmental requirements.

Review the parts list
04

Prepare the handoff

Keep approved references and connection information with the installation team.

Prepare the handoff

At which stage is your project?

Whether you are identifying a failed module or planning a full screen, share the information available now.

Talk Through the Parts List