LED Switching Power Supply Checklist (PDF)
Gather required DC output, approved circuit load, site AC input and cabinet airflow details for power-supply selection.
Download Checklist (PDF)A replacement supply must match the required DC output and have a suitable load plan, input conditions and mounting space.
Application: Cabinet power distribution for new displays or replacement of a failed supply.
Interface to check: Confirm DC voltage, output capacity, AC input, connector arrangement and available airflow.
Service note: Label circuits and isolate power before work; installation should follow the approved electrical design.
Power units should be selected from a documented load calculation, including the connected modules and cabinet electronics. Electrical ratings are then checked against the available site input and protective devices.
Enclosure space, fastening points and airflow matter as much as the output label. A service replacement should also account for the existing terminal layout and the planned isolation method.
The specified voltage must agree with the connected modules and control electronics.
Calculate expected demand and allocate supplies according to the cabinet distribution plan.
Check clearance, fastening and cooling conditions inside the enclosure.
Gather required DC output, approved circuit load, site AC input and cabinet airflow details for power-supply selection.
Download Checklist (PDF)| DC output | Match the approved module and card requirements |
|---|---|
| Load | Review expected demand and allocation per circuit |
| AC input | Confirm site supply and protection arrangement |
| Enclosure | Check mounting, airflow and access |
Size the supply from the approved circuit load and confirm output voltage, site input and cabinet airflow; electrical work should follow the project design.
COMPONENT INQUIRY
Attach the existing supply label, cabinet load calculation and a photo of the mounting space. These details help identify the required output and installation fit.